Notice of refusal to initiate an environmental impact assessment
Public from: 31.07.2023
Public until: for an indefinite period
Public until: for an indefinite period
The Transpordiamet publishes this announcement under § 12 (11)2) of Environmental Impact Assessment and Environmental Management System Act.
Transport Authority as a decision-maker announces that its 26.07.2023 order No 1.1-3/23/545 State route 4 (E67) Tallinn-Pärnu-Ikla km 122.6-125.2 section, incl. Tuisu street breakthrough construction project planned activities environmental impact assessment (EIA) has not started.
In order to increase road safety, improve the permeability of the highway and improve the convenience of driving, the section of the Tallinn-Pärnu-Ikla Sauga-Pärnu road section with 2 +2 lanes will be built as a road with a 2 +2 lane, incl. a Tuisu street breakthrough will be established. A rabbit-back roundabout is built into a two-track so-called turboring junction to increase permeability. A bike and footpath tunnel is being built in the neighborhood of the current traffic light crossing in the Sauga borough. Four traffic-adjustable intersections, connecting paths and cycle and footpaths will be established. Traffic signs with variable information are installed to streamline traffic. Variable traffic signs are set up to work with traffic light intersections to reduce the brakes and accelerations of traffic flow along the main route. The section of the road will receive lighting and noise walls will also be built.
EIA was not started § 38 (1), subsections 101 (2) and (3) of the Building Code, subsection 11 (6) of the traffic Act and clause 10 (3) 1) of Regulation No 82 of the Minister of Economic Affairs and infrastructure of 03.12.2020 “statutes of the Transport Board”, clause 3 (1) 1), clause 6 (2) 10), § 9, subsection 11 (2), (22) of the Environmental impact assessment and Environmental Management System Act (KeHJS), 23, 4, 8, 81 and 9, paragraph 12(1)¹ (2), paragraph 13(8) of Regulation No 224 of the Government of the Republic of 29.08.2005, entitled “List of areas of activity for which an ex ante assessment of the need for an environmental impact assessment must be carried out”, and taking into account that the authorities concerned have no objections.
The developer is Transpordiamet (registry code: 70001490) , contact details: White 4, 11413 Tallinn, tel 620 1200, e-mail info@transpordiamet.ee.
The decision-maker is Transport Authority (contact person Arto Juhansoo, e-mail arto.juhansoo@transpordiamet.ee, phone 554 6771).
The decision not to start an EIA is available at On the website of the Transport Authority: https://transpordiamet.ee/transpordiamet-jattis-algatamata-keskkonnamoju-hindamise-riigitee-nr-4-e67-tallinn-parnu-ikla-km
Transport Authority as a decision-maker announces that its 26.07.2023 order No 1.1-3/23/545 State route 4 (E67) Tallinn-Pärnu-Ikla km 122.6-125.2 section, incl. Tuisu street breakthrough construction project planned activities environmental impact assessment (EIA) has not started.
In order to increase road safety, improve the permeability of the highway and improve the convenience of driving, the section of the Tallinn-Pärnu-Ikla Sauga-Pärnu road section with 2 +2 lanes will be built as a road with a 2 +2 lane, incl. a Tuisu street breakthrough will be established. A rabbit-back roundabout is built into a two-track so-called turboring junction to increase permeability. A bike and footpath tunnel is being built in the neighborhood of the current traffic light crossing in the Sauga borough. Four traffic-adjustable intersections, connecting paths and cycle and footpaths will be established. Traffic signs with variable information are installed to streamline traffic. Variable traffic signs are set up to work with traffic light intersections to reduce the brakes and accelerations of traffic flow along the main route. The section of the road will receive lighting and noise walls will also be built.
EIA was not started § 38 (1), subsections 101 (2) and (3) of the Building Code, subsection 11 (6) of the traffic Act and clause 10 (3) 1) of Regulation No 82 of the Minister of Economic Affairs and infrastructure of 03.12.2020 “statutes of the Transport Board”, clause 3 (1) 1), clause 6 (2) 10), § 9, subsection 11 (2), (22) of the Environmental impact assessment and Environmental Management System Act (KeHJS), 23, 4, 8, 81 and 9, paragraph 12(1)¹ (2), paragraph 13(8) of Regulation No 224 of the Government of the Republic of 29.08.2005, entitled “List of areas of activity for which an ex ante assessment of the need for an environmental impact assessment must be carried out”, and taking into account that the authorities concerned have no objections.
The developer is Transpordiamet (registry code: 70001490) , contact details: White 4, 11413 Tallinn, tel 620 1200, e-mail info@transpordiamet.ee.
The decision-maker is Transport Authority (contact person Arto Juhansoo, e-mail arto.juhansoo@transpordiamet.ee, phone 554 6771).
The decision not to start an EIA is available at On the website of the Transport Authority: https://transpordiamet.ee/transpordiamet-jattis-algatamata-keskkonnamoju-hindamise-riigitee-nr-4-e67-tallinn-parnu-ikla-km
Business names
Transpordiamet, invalid business names: Maanteeamet.
Transpordiamet
Valge 4, 11413 Tallinn
Phone: +372 6201200
E-mail: info@transpordiamet.ee
Valge 4, 11413 Tallinn
Phone: +372 6201200
E-mail: info@transpordiamet.ee
Announcement number 2100345